We Started the Day with Clear Intention to Get Load of Labanon Cedar Logs Off to Iowa. We Ended the Day with Loading Glitch. We Need to Come Back to Tyler to Finish the Job.
42-FT FLATBED TRUCK READY TO TAKE 45,000 LBS OF CEDAR LOGS. UNFORTUNATELY,
TRUCK DID NOT HAVE 8 PIPE STAKES TO HOLD THE LOGS ON THE FLATBED. WE NEED TO RESCHEDULE
LOADING.